Descargar Imprimir esta página

Monogram FORGE02S6VM Manual Del Propietário página 18

Publicidad

4. Lift the upper half of the press
an ice gem between the two
Place the upper half of the ice
press on top of the ice. See Fig.
down on the handle while ice is
being melted.
6.
used. It is recommended not to
wide by 4" tall so that it can
7. Immediately after the upper
lift the top half of the press and
ice sphere. Ice spheres may be
49-9000023 Rev. 1
the lower half of the press.
Fig. 3) Place the upper half of
the ice press on top of the ice.
Fig. 4) Wait until the ice press
is completely closed.
ice sphere.
18

Publicidad

loading

Este manual también es adecuado para:

Forge02pack