Descargar Imprimir esta página

Glacier bay HDQFS1A9277CP Guía De Instalación Y Cuidado página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
3
Installing the drain
Install main plunger (L), rubber washer (M) and
drain body (O) above the sink.
From below the sink, install the lock nut (N).
4
Making the water supply connections
CAUTION: Ensure the supply lines do not kink, twist or
bend into a "V" or "L" shape during installation. Do not use
if there are visible signs of damage.
Use two adjustable wrenches to connect and
tighten the supply lines to the supply valves.
Connect the red supply line to the hot water
supply valve.
Connect the blue supply line to the cold water
supply valve.
L
M
O
N
RED LINE
1
HOT
COLD
5
Please contact 1-855-HD-GLACIER for
BLUE LINE
1
2
HOMEDEPOT.COM/GLACIERBAY
further assistance.

Publicidad

loading