Descargar Imprimir esta página

Craftsman 536.887994 Manual Del Operador página 21

Publicidad

Idiomas disponibles

Idiomas disponibles

3,
Remove
the bottom
panel.
Bolt
Bottom
Panel
Auger
Housing
4. Remove screw from belt cover,
Remove the belt cover (see
Figure 17).
5. Loosen the belt guide. Pull the belt
guide away from the auger drive
pulley (see Figure 20).
6. Pull the idler pulley away from the
auger drive belt.
7. Remove the old auger drive belt
from the auger drive pulley and
_
Traction Drive Be,t
Engine Pulley
from the engine pulley, Replace
the auger drive belt with an original
equipment replacement belt avail-
able from a Sears service center.
8. Install the new auger drive belt
onto the auger drive pulley and
onto pulley.
9. Adjust the auger drive belt. See
"How To Adjust The Auger Drive
Belt" in the Service And Adjustment
section.
10. Adjust the belt guide. See "How To
Adjust The Belt Guide" in the Ser-
vice And Adjustment section.
11. Install the belt cover. Tighten
screw (See Figure 17).
12. Check the adjustment of the cables.
See "How To Check And Adjust The
Cables" in the Service And Adjust-
ment section.
13. Install the bottom
panel (see
Figure 19).
14. Tighten the bolts on each side of
the bottom
panel.
15. Connect the spark plug wire.
Belt Guide
Auger Idler Pulley
Auger Drive Pulley
Auger Drive Belt
E-Ring
Swing Plate
Axle Rod
Traction Drive
Spring
Traction
Drive Belt
Traction
Drive Pulley
Engine
Pulley
Figure 20
F-03t0107L
21

Publicidad

loading