Descargar Imprimir esta página

Bio+ 29 Manual De Instalación Y Mantenimiento página 37

Publicidad

Idiomas disponibles

Idiomas disponibles

5.1.
Heat Exchanger.
Open the left side door, secured by 2 Torx head screws.
Pull the drawers of the rake-this shall be done while the glass door closed in order to reach the ash inside the
boiler. This shall be done every day when the boiler is cold.
Drawers of the rake.
Left side door.
5.2.
Burning pot & Burning pot holder.
Clean the burning pot, check its holes and vacuum the burning pot holder. After cleaning, replace the burning
pot correctly.
5.3.
Fireplace door.
Clean the glass with a towel, using a liquid for glass cleaning, always when cold.
5.4.
Security grill of the fireplace. (Bio+ 29)
Simply brush the grill descaling the soot which may be adhered, using the cleaning brush sent in a cardboard
box inside the boiler fireplace
5.5.
Ash box.
Empty the ashtray box and hoover its location.
Ash box.
DAILY CLEANING WHEN THE BOILER IS COLD.
Drawing 13
WEEKLY MAINTENANCE.
36
Drawing 12
Drawing 14

Publicidad

loading

Productos relacionados para Bio+ 29

Este manual también es adecuado para:

16Hs 03-02Bx 02-00