Descargar Imprimir esta página

Maytag SkyBox MBV1976AA Manual Del Usuario página 6

Distribuidor personal de bebidas
Ocultar thumbs Ver también para SkyBox MBV1976AA:

Publicidad

Idiomas disponibles

Idiomas disponibles

Assembly
Stand Assembmy
Carefully unpack the stand parts (see below) from the
packaging.
ToomsNeeded:
, #2 phillips head screw driver
Adjustable
Wrench
, Level
Parts
A End Frame .......................................................................................................
2
B Long Support Rail.......................................................................................
4
C RearLevelingLegs(attachedto end frames]..............................
2
D Shelves ..............................................................................................................
2
E Pan-HeadSc{ews.....................................................................................
24
F Left Side Panel(with hinge holes] .....................................................
1
G Right Side Panel(witI_no hinge holes]...........................................
1
H Back Panel......................................................................................................
1
I
Door....................................................................................................................
1
J
Hinges (attachedto the dooO..............................................................
2
K Front Foot . ........................................................................................................
2
L M5 x 16 Hex-PhillipsHeadCap Screw - _" (16mini long....6
M Front FootLevelingHead........................................................................
2
N Fiat HeadScrews .........................................................................................
6
FF M5 x 20 Hex-PhillipsHeadCap Screw - 3/4" ( 20ram] long__2
STEP 1 - Assemble
Frame of Stand
B
• Connect one long support rail (:B) to one of the end
frames I:A) by inserting the tabs on the support
rail
into the slots of the end frame and pressing
downward.
The support rails will temporarily
lock into
place when pressed downward.
• Connect the other end of support rail to a second
end frame I:A) by inserting the tabs on the support
rail into the slots of the end frame and pressing
downward.
• Repeat procedure
for remaining
3 rails, creating a
basic frame for the cabinet. DO NOT INSTALL
ANY
SCREWS
I:E) DURING
THIS STEP!
STEP 2 - Level the Stand
@M
C
WM
g
Lx3
Lx3
• Attach the two front feet (K) to the bottom of the
two corner posts using three M5 x 16, 5/8" (16 ram]
long, Hex-Phillips
head cap screws I:L) for each foot.
NOTE: The threaded
bolt on the front foot must
extend outward away from the frame (see figure).
• Attach the front foot leveling head I:M) to the
threaded
bolt on each front foot I:K).
• Carefully place the partially assembled stand on the
floor where it will be displayed. Adjust the front foot
leveling heads I:M) down so that the front foot roller
is just off the floor. Using a level and an adjustable
wrench, adjust the two rear leveling legs I:C) so the
unit sits squarely on the floor.
STEP 3 - Install
Shelves
D
D
• Place bottom shelf (D) on top of lower support rails.
Align screw holes and install four pan-head screws
(E).
• Repeat procedure for center shelf I:D) which mounts
on the four tabs welded to the end frame.

Publicidad

loading