Descargar Imprimir esta página

Cooper Lighting Solutions WaveLinx Pro WAC2-POE Instrucciones De Instalación página 6

Ocultar thumbs Ver también para WaveLinx Pro WAC2-POE:

Publicidad

Idiomas disponibles

Idiomas disponibles

WaveLinx Pro
3.
Power the Wireless Area Controller (WAC).
• This product requires 120VAC only for power. The Wireless Area Controller contained inside is a PoE powered device with a
120VAC PoE injector pre-wired for installer convenience.
4.
Input power connection
• The entry point for the supply wiring is via the ¾" conduit on the bottom of the chassis.
• Use a suitable conduit to feed the source wiring safely into the chassis.
• See the diagram below for connection details.
• Please consult the image below for details about the maximum permissible supply wire gauges.
• Please do not touch the heating unit or let any wiring near it, as the surface may be very hot.
5.
For network communications, a wired Ethernet connection is required. Connect Ethernet cables appropriate for the application up
to a MAX distance of 300ft (91m) to building LAN.
6.
Connect to building network.
7.
Create Construction Group - see section on construction grouping.
8.
Finalize programing using the WaveLinx Pro Mobile App.
• See WaveLinx Pro manual for more information.
9.
Document the IEEE address found on the bottom of the WAC inside the enclosure on the site floor plans.
IB50301921 page 6
June 2022
WAGO detail
Input power:
120VAC 50/60HZ
via ¾" conduit
Building LAN connection
external port
Wireless Area Controller (WAC2-POE) with Outdoor Rated Enclosure
L / N / GND
connections
Wiring Information:
Strip wire: 1/2"-5/8"
Wire size: 12 AWG
Ground
Neutral
Line In
Solid/Stranded copper only
Building LAN
connection
www.cooperlighting.com

Publicidad

loading