Cha nge the
P.A.T. TESTING
The
60
of the machine when full should be classed as stationary. We recommend a
minimum time of 12 months for combined testing and inspection and monthly for
the formal visual inspection
EARTH CONTINUITY
Lift the sink and place out of the way allowing access to the heater element. Place
the earth clamp of the P.A.T. tester onto the heater element and take readings as
normal (use the 25amp setting for this test). The heater effectively earths the fluid in
the base of the machine.
EARTH LEAKAGE
A 500v Insulation Test has been carried out on manufacturing of this machine.
If a machine fails the 500v Insulation Test whilst in service a second test may be
carried out with the setting reduced to 240v
Microb ia l Filter Mat EVERY MONTH
machine is of a CLASS 1 construction and due to the weight