6. OPERATION
Connecting the discharge line
Scr
Connectiong the power supply and operation
Open any shut-off valves in the discharge line (accessories, water stop, etc.), so that air in
intak
Lift and hold the discharge hose at least 1m vertically above the pump (to prevent any flo
medium from escaping from the pump via the discharge hose), then connect the power
to an earthed 220-240V 50Hz power supply (10 amp fuse minimum), and put down
dischar
NOTE: The maximum self-priming head of 8m is only achieved
the pump is filled until it overflows via the filter chamber and
discharge hose is held at least 1m higher, so that no water can escape via
dischar
During operation
The motor is protected against overheating by an integrated thermostat. In the even
of overheating, the thermostat will automatically switches off the pump. The pump
automa
Depending on the suction height and the amount of air in the intake line, priming can tak
anywhere between 1 minute to 5 minutes. If it takes longer than this, the pump should
r
water Always remove the plug from the socket before refilling!
If at any time after use the pump to be removed, it must always be refilled with wat
whenev
EN
20151208 SPECIFICATIONS 250 TP-3 EXE.indd 118
r connect
nt
8
r
nt
e
ft
d
e
r ft
c
o
ower
118
ressur connect
.
2
r connect
8
7
08/12/15 16:21