Descargar Imprimir esta página

Kenmore ELITE trio 596.7759 801 Serie Manual De Uso Y Cuidado página 6

Refrigerador con congelador en la parte inferior

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Fasten the shutoff valve to the cold water pipe with the pipe
clamp. Be sure the outlet end is solidly in the 1/4"drilled hole
in the water pipe and that the washer is under the pipe clamp.
Tighten the packing nut. Tighten the pipe clamp screws
slowly and evenly so the washer makes a watertight seal. Do
not overtighten or you may crush the copper tubing.
7. Slip the compression
sleeve and compression
nut on the
copper tubing as shown. Insert the end of the tubing into the
outlet end squarely as far as it will go. Screw compression
nut
onto outlet end with adjustable wrench. Do not overtighten.
8. Place the free end of the tubing in a container or sink, and
turn ON the main water supply. Flush the tubing until water is
clear. Turn OFF the shutoff valve on the water pipe.
Connect
to Refrigerator
Depending on your model, the water line may come down from
the top or up from the bottom. Follow the connection instructions
for your model.
Style 1
1. Remove plastic cap from water valve inlet port. Attach the
copper tube to the valve inlet using a compression
nut and
sleeve as shown. Tighten the compression
nut. Do not
overtighten. Confirm copper tubing is secure by pulling on
copper tubing.
2. Create a service loop with the copper tubing. Avoid kinks
when coiling the copper tubing. Secure copper tubing to
refrigerator cabinet with a "P" clamp.
@
@
C
D
E
3.
A. Copper tubing
D. Compression
sleeve
B. "P" clamp
E. Water valve inlet port
C. Compression
nut
Turn on water supply to refrigerator and check for leaks.
Correct any leaks.
Style 2
1. Create a service loop (minimum diameter of 2 ft [61 cm]) with
the copper tubing. Avoid kinks when coiling the copper
tubing.
2. Remove the plastic cap from water valve inlet port. Place a
compression
nut and sleeve on the copper tubing.
3. Insert the end of the copper tubing into the water valve inlet
port. Shape tubing slightly so that the tubing feeds straight
into the port to avoid kinks.
4. Slide the compression
nut over the sleeve and screw into the
water valve inlet port.
5.
A. Plastic water tubing
C. Compression
nut
B. Sleeve
D. Copper tubing
Using an adjustable wrench, hold the nut on the plastic water
line to keep it from moving. Then, with a second wrench turn
the compression
nut on the copper tubing counterclockwise
to completely
tighten. Do not overtighten.
6.
A. Plastic water fine
B. Water valve inlet port
C. Compression
nut
D. Copper tubing
E. "P" clamp
Check connection by pulling on copper tubing. Attach copper
tubing to refrigerator cabinet with a "P" clamp. Turn on water
supply to refrigerator and check for leaks. Correct any leaks.
Complete the Installation
Electrical Shock Hazard
Plug into a grounded 3 prong outlet.
Do not remove ground prong.
Do not use an adapter.
Do not use an extension
cord.
Failure to follow these instructions can result in death,
fire, or electrical
shock.
1. Plug into a grounded 3 prong outlet.
NOTE: Allow 24 hours to produce the first batch of ice. Discard
the first 3batches of ice produced. Allow 3 days to completely fill
the ice container.
6

Publicidad

loading