Descargar Imprimir esta página

Venmar ESB10 Instrucciones De Instalación página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

1. INSTALL DUCTWORK
Plan where and how the ductwork will be installed.
Install proper-sized ductwork, elbow(s) and roof or wall cap for the type of blower you are installing. If using 6" (150 mm) round
ducts, use a transition. Use 2" (50 mm) metal foil duct tape to seal joints.
Roof cap
-
6" round duct
3%" x 10" duct
3%" x 10" to 6"
Arne
transition
Wall ca
Wall ca
HHOO1A
Lad
HHO014A
Lol
2. MEASURE THE INSTALLATION
Dimensions for the most common
installations are shown below.
We recommend to install the hood at a minimum of 20" (608 mm) from an electric range and at 24" (610 mm) from a
gas range.
For optimal performance, the hood should not be installed more than 30" (762 mm) from cooktop.
Cabinets
Cabinets
Hood
~~
Hood
sy
o s
30" maximum
20" minimum
clearance
clearance
(24" for gas)
Standard
Standard
36" height
36" height
cooktop
cooktop
HHOOI3A
HHOO12A

Publicidad

loading

Productos relacionados para Venmar ESB10

Este manual también es adecuado para:

QdeEsc270