IMPORTANT NOTES FOR THE INSTALLER
TECHNICAL SPECIFICATIONS
DESCRIPTION OF THE COMPONENTS
INSTALLATION
Electrical preparations (standard system) Fig. 4.
Preliminary checks
Walling in the supporting box
Installing the leaf
Installing the gearmotor
Electrical connections
START-UP
MANUAL OPERATION
RESTORING NORMAL OPERATION
AVAILABLE ACCESSORIES
Encoder
Mechanical stops
MAINTENANCE
REPAIRS
SPECIAL APPLICATIONS
EU DECLARATION OF CONFORMITY
The Manufacturer
Company name:
FAAC S.p.A. Soc. Unipersonale
Via Calari, 10 - 40069 Zola Predosa - BOLOGNA
Address:
- ITALIA
hereby declares under his sole responsibility that the following product:
Description:
Underground actuator for swing gates
Model:
DIABLO
Complies with the following relevant Union harmonization legislations:
2014/30/EU
2011/65/EU
Furthermore, the following harmonised standards have been applied:
EN 61000-6-2:2005
EN 61000-6-3:2007 + A1:2011
Bologna, 19-03-2018
CEO
A. Marcellan
DIABLO
INDEX
DECLARATION OF INCORPORATION FOR PARTLY
COMPLETED MACHINERY
(2006/42/EC ANNEX II P.1, B)
Manufacturer and person authorised to draft the applicable technical
documentation
Company name:
FAAC S.p.A. Soc. Unipersonale
Via Calari, 10 - 40069 Zola Predosa - BOLOGNA
Address:
- ITALIA
Hereby declares that the partly completed machinery:
Description:
Underground actuator for swing gates
Model:
DIABLO
the following essential requirements of the Machinery Directive
2006/42/EC (including all applicable amendments) have been ap-
plied and fulfilled:
1.1.2, 1.1.3, 1.1.5, 1.1.6, 1.3.1, 1.3.2, 1.3.4, 1.4.1, 1.4.2.1, 1.5.1,
1.5.5, 1.5.6, 1.5.8, 1.6.1, 1.6.4, 1.7.1, 1.7.2, 1.7.3, 1.7.4.2, 1.7.4.3
and that the relevant technical documentation has been compiled in
compliance with part B of Annex VII.
Furthermore, the following harmonised standards have been applied:
EN12100:2010
EN13849-1:2015
EN13849-2:2012
Other applied standards:
EN 12453:2017
Undertakes to transmit by mail or by e-mail, in response to a reasoned
request by the national authorities, relevant information on the partly
completed machinery.
It is also declared that the partly completed machinery identified above
may not be commissioned until the final machine - into which it will be
incorporated - has been declared complaint with the provisions of the
above mentioned Machine Directive 2006/42/EC.
Bologna, 19-03-2018
6
page.7
page.7
page.7
page.7
page.7
page.7
page.7
page.8
page.8
page.8
page.8
page.8
page.8
page.8
page.8
page.8
page.8
page.8
page.8
CEO
A. Marcellan
00058I0941 - Rev.3