8.
Predrill holes in the below locations using 1/8" drill bit and using 3x #10x1" Screws,
install one (F4) per rail
(Figs. 11&12).
NOTE:
Kit comes with extra screws that can be used in this kit or when installing panels
to posts.
9.
Remove clamps from gate.
10.
Repeat steps 2-9 to install the second gate
upright.
6
⁄
⁄ " from the back of the gate upright and aligned with the rail
⁄
⁄
5
5
5
8
8
Fig. 11
Install F4
Install F4
Install F4
Here
Here
Here
Here
Install F4
Install F4
Here
Here
A A
Panel
Panel
F4
F4
Finished Gate Section
Finished Gate Section
Fig. 12
5/8"
5/8"