Check After Installation And Test Operation - Daitsu DS-18UIAK Manual De Usuario

Aire acondicionado residencial
Ocultar thumbs Ver también para DS-18UIAK:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Check after installation and test operation

Items to be checked
Has it been fixed firmly?
Have you done the refrigerant leakage test?
Is heat insulation sufficient?
Is water drainage well?
Is the voltage in accordance with the rated
voltage marked on the nameplate?
Is the electric wiring and piping connection installed
correctly and securely?
Has the unit been connected to a secure
earth connection?
Is the power cord specified?
Is the inlet and outlet been covered?
Has the length of connection pipes and refrige-
rant capacity been recorded?
Before test operation
1.
(1) Do not switch on power before installation isfinished completely.
(2) Electric wiring must be connected correctly and securely.
(3) Cut-off valves of the connection pipes should be opened.
All the impurities such as scraps and thrums must be cleared from the unit.
(4)
2.
Test operation method
(1) Switch on power, press "ON/OFF" button on the wireless remote control to start the operation.
(2)
Press MODE button, to select the COOL, HEAT (Cooling only unit is not available),
FAN to check whether the operation is normal or not.
Check after installation
The unit may drop, shake or emit noise.
It may cause insufficient cooling (heating)
capacity
It may cause condensation and dripping.
It may cause condensation and dripping.
It may cause electric malfunction or
damage the part.
It may cause electric malfunction or
damage the part.
It may cause electrical leakage.
It may cause electric malfunction
or damage the part.
It may cause insufficient cooling (heating)
capacity.
The refrigerant capacity is not accurate.
Test Operation
- 26 -
Possible malfunction

Hide quick links:

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Dos-18uiak

Tabla de contenido