Descargar Imprimir esta página

ABB ACH580-04-505A-4 Instrucciones De Instalacion Y Puesta En Marcha página 13

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 59
Step
Task
2
Run the motor cables to the cabinet. Ground the cable shields 360° at the cabinet
entry.
3
Connect the twisted shields of the motor cables to the grounding terminal.
4
Screw in and tighten the insulators to the drive module by hand. Install the T3/W2
connection terminal to the insulators.
Do not use longer screws or greater tightening torque than specified
in the installation drawing. They can damage insulator and cause a
dangerous voltage to be present at the module frame.
5
Connect the phase T3/W3 conductors to the T3/W2 terminal.
6
Connect the phase T3/W2 connection terminal to the insulators. See the warning
in step 4.
7
Connect the phase T2/V2 conductors to the T2/V2 connection terminal.
8
Install the T1/U2 connection terminal to the insulators. See the warning in step 4.
9
Connect the phase T1/U2 conductors to the T1/U2 terminal.
10
Option +B051 (if there is no bottom plate in the cabinet and degree of protection
of IP20 is needed):
• Carefully step drill sufficiently big holes to the inner clear plastic shrouds for
the motor cables to be connected. Smooth the hole edges. Cut the shroud from
the holes to the edge to make it possible to put the shroud around the cables.
• Remove the plastic sheeting from both sides of the shrouds.
11
Option +B051: Put the inner clear plastic shrouds of figure O around the motor
cables.
12
Option +B051:
• Remove the plastic sheeting from both sides of the output clear plastic shroud.
Install the shroud to the drive module.
• Install the lower front cover to the drive module.
Connect the input cables and install the shrouds
See . For the connection diagram, see figure G.
Step
Task
1
Ground the input cable shields (if present) 360° at the cabinet entry.
2
Connect the twisted shields of the input cables and separate ground cable (if
present) to the cabinet grounding busbar.
3
Option +B051:
• Carefully step drill sufficiently big holes to the cable entry clear plastic shroud
for the cables to be connected.
• Align the holes in the vertical direction according to the alignment holes in the
shroud. Smooth the hole edges.
• Remove the plastic sheeting from both sides of the shroud.
• Attach the cables firmly to the cabinet frame to prevent chafing against the
hole edges.
EN – Quick installation and start-up instructions 13
Figure
K
L
M
EN
DA
N
DE
-
ES
FI
FR
O
IT
NL
PL
P
PT
Q
SV
TR
ZH
Figure
-
R

Publicidad

loading