Descargar Imprimir esta página

GE 26 Manual Del Propietario Y Instalación página 19

Refrigeradores congelador inferior

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Instructions
[]
REMOVE THE FREEZER DOOR
_'1 Pullthe freezer door open to full extension.
[]
Removethe freezer bin by pulling both brackets upward
at the same time. (Seepage 10.)
[]
Take out the lower basket by lifting the basket up from
the rail system. (Seepage 10.)
rD-] Removethe two 10 mm hex-head bolts from the right
and left side.
REMOVE THE FREEZER DOOR (cont.)
Usethe tip of a screwdriver to separate the rail from
the rail cover.Tilt the front end up and lift the entire door.
D
Set the door front on a nonscratching surface.
r_
Pushthe rail assemblies back into the cabinet.
-& CAUTION:
P ushboth sides of the rail
assemblies back at the same time.
[] REPLACING THE FREEZER DOOR
Two people may be required to complete this procedure.
ATTACH AND SECURE THE DRAWER FRONT TO
THE SLIDES
_]
Pullout the rail assemblies to the full length on each side
of the cabinet.
CAUTION:
Make sure to pull out the side
rails evenly.
19

Publicidad

loading