Finishing the Water Cooler Installation
Be sure to dispense a little water from both the hot and cold buttons prior to
flipping on the heating (#7) and cooling (#6) switches located on the back of the machine.
8. Once the heating switch (#7) is turned on (I),
it will take 15-20 minutes for the water to
reach it's desired hot temperature.
9. Once the cooling switch (#6) is turned
on (I), it will take up to 1 hour to reach the
desired cold temperature.
15-20
min
Hot
1 hr
Cold
English
Getting Started
20