Descargar Imprimir esta página

Gardena MultiControl duo Libro De Instrucciones página 17

Control de riego
Ocultar thumbs Ver también para MultiControl duo:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 54
2 Bars
Battery half full
Valve opens.
The Water Control is
guaranteed to work for
a minimum of 4 more
weeks.
3. INITIAL OPERATION
Insert battery [ Fig. I1 / I2 ]:
The Water Control must only be operated with
a 9 V alkalimanganese (alkaline) battery type
IEC 6LR61.
1. Remove controller
Water Control.
2. Insert battery in the battery compartment
Observe correct polarity
The display shows all the LCD-symbols for
2 seconds and then moves to the time / day
of week level.
(16)
3. Install controller
Set display to 24-hours or 12-hours (am / pm):
The factory setting is the 24-hour display.
v Press the Man. button continuously while
inserting the battery.
To connect the Water Control [ Fig. I3 ]:
The Water Control is fitted with a sleeve nut
taps with (G 1") (33.3 mm) thread. The adaptor
(18)
supplied
allows the Water Control to be con-
nected to taps with a (G 3/4") thread (26.5 mm).
1. For tap with a G 3/4" (26.5 mm) thread:
(18)
Screw adaptor
(do not use pliers).
2. Screw sleeve nut
the adaptor thread by hand (do not use pliers).
3. Screw Tap Control
outlets.
Connect the soil moisture sensor (optional):
Once the soil is sufficiently moist, a watering
operation as per schedule will not be carried
out. Manual operation is possible at all times.
GAR_01874-20.960.11_2023-12-08.indb 17
GAR_01874-20.960.11_2023-12-08.indb 17
1 Bar
Battery low
Valve opens.
The Water Control will
continue to work for no
more than 4 weeks.
It is advisable to change
the battery.
v Replace battery (see 3. INITIAL OPERATION Inserting battery).
(16)
from the housing of the
(17)
(P)
.
on the housing again.
(19)
on to the tap manually
(19)
of the Water Control on to
(20)
onto the two Water Control
0 Bar
Battery almost flat
Valve still opens.
The Water Control stops
working soon.
The battery must be
changed soon.
Sensor assignment [ Fig. I4 ]:
(a)
A sensor in Connector 1:
Sensor only applies to Valve 1
(b)
A sensor in Connector 2:
Sensor applies to both valves
(c)
Sensor in Connectors 1 and 2:
Sensor 1 applies to Valve 1
.
Sensor 2 applies to Valve 2
1. Place the soil moisture sensor in the watering
area.
2. Remove controller
Water Control.
3. [ Fig. I5 ]: If necessary, connect sensor to
Extension Cable or Adaptor at the sensor
(21)
connection
of the Water Control.
Activate sensor [ Fig. I6 ]:
A sensor will be automatically activated after 60 sec.
The sensor assignment
current sensor status dry / wet will be displayed.
E. g. Sensor 1 dry (dry) Valve 1
for
Deactivate sensor [Level 6]:
If watering is to be without a sensor, although
a sensor was previously activated, then this sensor
must be deactivated.
1. Remove sensor from the Water Control.
2. [ Fig. I6 ]: Press Menu button 5 times [Level 6].
The sensor assignment
and the current sensor status dry / wet will be
displayed.
3. [ Fig. I7 ]: Press OK button.
The sensor has been deactivated.
To connect older sensors (with 2-pin connector),
the GARDENA Adapter Cable
Art. 1189-00.600.45 is required, which can
be procured from GARDENA Service.
Frame is flashing
Battery flat
Valve does not open.
The Water Control stops
working.
The battery must be
changed.
(16)
from the housing of the
(a)
(b)
(c)
,
or
(arrow) and the
(a)
only.
(a)
(b)
(c)
,
or
(arrow)
08.12.23 11:47
08.12.23 11:47
17

Publicidad

loading

Este manual también es adecuado para:

1874