GB
We,
Company Name:
Postal address:
Postcode:
Telephone number:
E-Mail address:
Declare that this DOC is issued under the sole responsibility of the manufacturer.
Apparatus model/product:
Type:
Serial Number(s):
I hereby declare that the partly completed equipment named above in its conception, construction
and form put by us on the market:
• MUST NOT BE PUT INTO SERVICE WITHIN THE EU UNTIL THE FINAL MACHINERY INTO WHICH
IT IS TO BE INCORPORATED HAS BEEN DECLARED IN CONFORMITY WITH THE MACHINERY
DIRECTIVE (2006/42/EC) AND ALL OTHER APPLICABLE EU DIRECTIVES
• Is designed and constructed solely as a non-functional component to be incorporated into a machine
requiring completion
• Is in conformity with the relevant Essential Health and Safety Requirements of the EC Machinery
Directive (2006/42/EC) shown overleaf and other directives listed overleaf
The relevant technical documentation is in accordance with the provisions of part B of Annex VII of the
machinery directive and is the responsibility of the signatory below. All relevant information about the
partly completed machinery will be provided, by email, on a reasoned request by the appropriate
national authority.
The name and address of the representative authorised to compile the relevant technical documentation is:-
Hugues Menager
Altrad (Group Holding), 125 Rue du Mas Carbonnier, 34000, Montpellier, France.
Signed by:
Ray Neilson
Managing Director
On behalf of Altrad Belle, Sheen, Derbyshire, UK
Place of Declaration:-
Sheen, Nr. Buxton, Derbyshire, SK17 0EU, UK
Date of Declaration:-
December 2022
CE Declaration Of Incorporation of
Partly Completed Machinery
Altrad Belle
Sheen, nr. Buxton, Derbyshire
SK17 0EU
+44 (0)1298 84606
sales@altrad-belle.com
Battery Power Head
82v 1.5kW Li-Ion
101 YYMMDD 0000001 to 101 YYMMDD 9999999
11
GB
866/90003/0_GB