Descargar Imprimir esta página

Progress Lighting Paso P250109 Serie Manual De Instalación página 9

Ventilador de techo

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 1. Loosen the two set screws and remove
the hitch pin and lock pin from the central
shaft/top coupling of the motor assembly. Doing
so will allow the down rod to enter the central
shaft. (Fig. 11)
Step 2. Route wires exiting from the top of the fan
motor through the coupling cover, canopy cover
and canopy and then through the ball/downrod.
(Fig. 11)
Step 3. Align the holes at the bottom of the down-
rod with the holes in the collar on top of the motor
housing. Carefully insert the hitch pin through the
holes in the collar and downrod. Be careful not to
jam the pin against the wiring inside the downrod.
Insert the lock pin through the hole near the end of
the hitch pin until it snaps into its locked position.
(Fig. 11)
WARNING/CAUTION: Failure to properly
install lock pin as noted in step 7 could result in
fan loosening and possibly falling.
Step 4. Tighten two set screws on top of the fan
motor firmly and slide the coupling cover down.
Step 5. Now lift the motor assembly (fan with
blades) into position and place the hanger ball into
the hanger bracket.
Rotate down rod until the "Check Tab" has
dropped into the "Registration Slot" and the down
rod and ball assembly seat firmly. The down rod
and ball assembly should not rotate if this is done
correctly. (Fig. 12)
Downrod
Set screws
II
Hitch pin
Figure 11
Figure 11
Supply wires
Canopy
Canopy cover
Figure 12
Coupling cover
Warning: Make sure tab at bottom of hanger
Lock pin
bracket is properly seated in groove of hanger
ball before attaching canopy to bracket. Failure
Set screws
to properly seat tab in groove could cause
damage to electrical wiring.
Registration
slot
Tab
6.

Publicidad

loading

Este manual también es adecuado para:

Paso p250109-031Paso p250109-163Paso p250109-31m