TRP Dynamic
PRIOR OPERATIONS:
• Disconnect the battery.
• Take down the evaporation unit's interior air
distribution panel.
INSIDE THE CABIN:
1
Position the template supplied and mark the
boreholes.
A- If there are 2 bunks, position the template
above the one chosen to install the unit.
B- If there is 1 bunk, place the template above
the bunk.
Make through bore Ø4 with long broach in bore
2
position Ø48, and then make the following
bores.
A- make (1) Ø35 in the cover only
B- make (1) Ø19 in the cover only
C- make (1) Ø48 in the cover only
D- make (4) Ø22 in the cover only
Air conditioning for vehicles
UP
1
UP
2D
19
EN
UP
Ø48
Ø35
Ø19
UP
Ø48
2
Ø35
Ø19
2C
2D
2A
2B