INSTALLATION Ⅰ (CEILING MOUNT) / INSTALACIÓNⅠ(MONTAJE EN TECHO FALSO)
1. Insert two suspension brackets.
2. Install the suspension bracket and x the
adaptor frame by using long screws.
Note
During installation the distance C
should be kept the same as the
drywall thickness.
Joist
Travesaño
Bottom ange
Pestaña inferior
Unit: inches (mm)
Unidad: pulgadas (mm)
Suspension bracket
Anclajes de suspensión
1. Open one knock-out hole on junction
box and connect wires.
(Refer to wiring diagram on page 4.)
2. Install insulated ducts to the OA and
EA adapter.
Tape
Cinta adhesiva
Joist
Travesaño
4 Long screws
(M4.2X30)
4 Tornillos largos
(M4.2X30)
13 1/2~16 (343~405)
There is the scale on the frame to adjust the C distance
which is the same as drywall thickness
Hay una escala en el marco para ajustar la distancia C,
que debe ser igual al grosor de la pared de yeso.
Insulated duct
Ducto insulado
Adaptor insulation from
Insulación desde el adaptador
1. Inserte dos anclajes de suspensión.
2. Instale el anclaje y asegure el marco adaptador
utilizando tornillos largos.
Nota
Durante la instalación, la distancia C debe
mantenerse igual al espesor del panel de yeso.
20
1
2
10
inch/mm
Scale
Escala
C
20
1
2
10
inch/mm
1. Abra el ori cio ciego en la caja de conexiones
y consulte los cables.
(Consulte el diagrama de cableado de la página 4.)
2. Instale ductos insulados a los adaptadores OA
y EA.
For 4" duct /
Para ducto de 4"
Adaptor
Adaptador
For 5" duct /
Para ducto de 5"
Adaptor
Adaptador
4 Long screws
(M4.2X30)
4 Tornillos largos
(M4.2X30)
Joist
Travesaño
Insulated duct
Ducto insulado
Tape
Cinta adhesiva
Insulated duct
Ducto insulado
Tape
Cinta adhesiva
6