Startup And Shutdown - Taurus IS 1000 M Manual Del Usuario

Inversor eléctrico
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Startup and Shutdown

connected to the same number of PV modules.
6.1 Start up the inverter
When start up the single phase string inverter, should fellow below steps:
1. First switch on the AC breaker.
voltage and power, the inverter will start.
3. When the AC voltage and DC voltage are normal, the start-up is ready to begin. The
crystal will show that the inverter is self-checking.
4. If the parameter is within acceptable range, the inverter will generate energy.
NORMAL indicator light is on.
6.2 Inverter Shutdown
connector. The inverter will close the LCD and all indicators within two minutes.
- 18 -

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Is 3000 mIs 1500 mIs 2600 m

Tabla de contenido