Descargar Imprimir esta página

Champion Essick WC37 Manual Del Usuario página 3

Ocultar thumbs Ver también para WC37:

Publicidad

Idiomas disponibles

Idiomas disponibles

• Install
window
panel
retainers.
Place
two
panel retainer
strips onto
bottom
of neck
flange
and position
to the width
of the window.
Cut the
strips to fit if necessary.
These
strips
hold
the
window
fill-in
panels
(Fig. 3).
Window Fill-In
Panels
Top Panel
Retainer
Bottom
Panel
Retainer
Fig. 3
• Position
cooler
in win-
dow.
Position
neck
of
cooler
so that bottom
of neck flange rests on window
sill and flange
(E-Fig.
2) is snug against
edge of sill (H-Fig.
2).
With cooler
in
position,
hook the "S" hooks into the holes of the top pan near the
back of the cooler
(B-Fig.
2).
• Break
fill-in
panels
to fit.
With cooler
installed,
as described
above,
measure
for each window
fill-in panel and score with sharp
knife and straight
edge guide to desired
width.
To break
window
fill-in panels,
the panel should be laid over the edge of a straight flat
surface
at the point to be broken
oft: Apply
pressure
on the edge
of the panel that extends
over the edge of the surface
and break
off
unwanted
piece.
• Install
fill-in panels.
Place one window
fill-in panel on each side
of grill and into panel
retainer
strip at bottom
of grill.
Place the
other panel retainer
strips onto top of neck flange and fill-in panels.
Be sure the panels are snug up against
cooler
neck.
• Place window
behind
retainer
strip.
Raise back of cooler
so that
the window
(D-Fig.
2) may be brought
down behind
top of panel
retainer
strip (C-Fig.
2).
• Level
Coolen
Adjust the chains to level the cooler.
• Adjust
house legs.
Pull out house
legs so that the rubber bumpers
rest against
house
siding
(F-Fig.
2).
Tighten
screw
in retaining
collar. (G-Fig.
2).
Connecting
Water
• Install
overflow
assembly.
Remove
nut and place nipple through
the hole in
the pan, with the robber washer between
the pan and the head of the drain nipple
(Fig. 4). Screw on nut and draw up tight
against
bottom
of pan.
Insert overflow
pipe in nipple
to retain water.
Overflow
pipe may be removed
to drain pan when
necessary.
A garden hose may be
screwed
on the drain
nipple
to
drain water away from your unit.
• Connect
water
supply
line.
In-
stall a sillcock and water valve on
faucet as shown by figure 5. Place
the nut and ferrule
on the tubing
and
tighten
the nut until water
tight.
Overflow
Pipe
,_;7_ _"
Nipple
C[ _
Rubber
Washer
...... c->)
Bottom
Pan
_)
Nut
Fig. 4
Faucet
-_
Fig. 5
Install float valve.
Install
valve in the provided hole in
corner post (Fig. 6) and attach
water supply line.
Fill pan.
Allow
water
to fill
to within
1" of the top of the
overflow pipe and adjust float
to maintain
this water
level.
This can be accomplished
by
bending
the
float rod (Fig.
6).
Water Snpply
Line
(orner
Post _...
_z_z
j
2
Fig. 6
Maintenance
_WARNING:
Before
doing any maintenance
be sure power is
off and unit is unplugged.
This
is for your safety.
Spring
Start-Up
• Oil bearings.
The blower
bearings
and cooler motor in this unit
should be oiled with a few drops of non-detergent
20/30 weight oil
once each year.
The motor
does not need oil if it has no oil lines
l_broiling.
Motors
that have no oil lines are lifetime
oiled at the
factory and require no further oiling
for the life of the unit.
z_CA
UTION:
Do not
over
oil.
Over oiling
can cause
motor
bum
3 Lb.
out, due to excessive
oil getting
into
/
3'4 Inches
motor winding.
T
• Check
belt tension.
A 3 lb. force
should deflect the belt 3/4 inches (see
Fig. 7). Readjust belt if needed.
Clean pump.
Cleaning
the pump is necessary
once a year at start-
up. For your safety, turn unit offand
unplug
from power
receptacle.
Remove
the pump from the mount
slot.
Remove
the base of the
pump
as shown
in Fig. 8. Clean
the pump
and turn the impeller
to ensure
tree operation.
Remove
the pump
spout and check for
any blockage.
After
cleaning,
reinstall
the base onto the pump.
Remove
Press firmly
to make
sure it is
Base.
secure.
Reattach
the pump
to
]
the mount
in the cooler
using
the plastic
retainer
to ensure
that
the pump will not overturn.
Do
" hnpeller
not forget
to replace
the spout
and water delivery
tube onto the
Fig. 8
pump outlet.
Replace
Pads.
Aspen
pads should
be replaced
once or twice
a
season,
depending
upon the length of the season.
At the beginning
and at mid season a clean pad is more absorbent
and efficient
and
will deliver
substantially
more cool air.
Winter
Shut
Down
• Drain watch
Always
drain all of the water out of the cooler
and
water
supply line when not in use Ibr prolonged
periods,
and par-
ticularly
at the end of the season.
Keep the water line disconnected
from both the unit and water
supply so that it does not freeze.
• Cover
unit.
To protect
the life of the finish, a cover for the unit is
suggested
in extended
periods
of non use.
110496-1
3

Publicidad

loading