Cond 7310
Display
3
ӕ
2
1417
[Tr25][nLF][ 0.479 1/cm]
1
HOLD
AR
Menu
Jack field /connections
1
Initial
commissioning
ba75934y02
05/2017
µS/cm
25.0
°C
01.07.2011
USB output
08:00
2
1
Insert the supplied batteries.
Make sure that the poles are in the correct position.
2
Connect the power pack if necessary.
3
Switch on the meter with the <On/Off> key.
Caution
Follow the safety instructions of the used sensors.
The operating manuals of the sensors are available on the supplied CD and on
the Internet under www.WTW.com.
1
Status information
2
Measured value (with unit)
3
Measured parameter
4
Sensor symbol
(calibration evaluation)
4
5
Measured temperature (with unit)
5
6
Further status information
6
7
7
Softkeys and date/time
1
Conductivity measuring cell
2
USB B interface (device)
3
Connection for line adaptor
4
Service interface
3
4
EN
English
5