Steren CAU-265 Manual De Instrucciones página 18

Ocultar thumbs Ver también para CAU-265:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Metallic base
1. Soldering base
1
2. Cleansing sponge
2
Installation
Before to use the soldering, wet the sponge.
Be sure to turn the station off before to connect it.
1. Place the station onto a fl at surface and the soldering into the metallic
base.
2. Insert the soldering into the DIN connector of the station and tighten the
security nut.
3. Connect the power cord to the station, then connect it to the power
supply.
18

Publicidad

Tabla de contenido
loading

Tabla de contenido