9.5 kW (220 V~)
32 / EN
Line 1 (L1)
Line 2 (L2)
Ground
Power supply
12 kW (220 V~)
Line 1 (L1)
Follow the numbered steps below for a correct installation:
Line 2 (L2)
Ground
1.
Check that the voltage is appropriate for this appliance, you can verify the voltage on
Power supply
12 kW (220 V~)
the product data label.
2.
Install the water heater as close as possible to the electric current (charging center),
with the voltage that will be used, which must be accessible and must include a switch
break or QO Breaker.
3.
As a safety measure it is obligatory to install a thermo-magnetic circuit breaker
according to the model (see the electrical specifications table) independently of the
main line, for automatic deactivation in the case of an electrical fault or imbalance.
4.
Extend or lead the independent cables from the power supply through a conduit tube
or polyduct to the heater.
Power relay
-K1
Eleva 12 kW V2
Heating elementgs
-H.E.1
-H.E.2
-RT1
-RT2
Power relay
PCB indicator
-K1
Heating elementgs
-H.E.1
-H.E.2
PCB indicator
Eleva 12 kW V2
-RT1
-RT2
Power relay
-K1
Heating elementgs
-H.E.1
-H.E.2
-H.E.3
PCB indicator
Reed Relay
-RR
-K2
-S1
-S2
Thermostat
-RT3
Reed Relay
-RR
-K2
-S1
-H.E.3
Thermostat
-RT3
Reed Relay
-RR
-K2
-S1
-S2
Command switch
Power led
-H1
-H2
-H3
Command switch
-S2
Power led
-H1
-H2
-H3
Command switch
Power led
-H1
-H2