Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6 MAINTENANCE
6. Clean the power source with dry compressed air (4 bar) as follows:
a) The upper rear part.
b) From the rear panel through the secondary heat sink.
c) The inductor, transformer and current sensor.
d) The power components side, from the rear side behind PCB 15AP1.
e) The PCBs at both sides.
7. Make sure that there is no dust left on any part.
8. Install the plastic cover between the heat sink and the fan (2) and make sure it is
correctly fitted against the heat sink.
9. Do a test of the power source according to IEC 60974-4, follow the procedure in section
"After repair, inspection and test" in the Service manual.
10. Install the top panel on the power source.
11. Install the side panels on the power source.
12. Connect the mains supply.
6.3

Welding torch

A regular programme of care and maintenance reduces unnecessary and expensive
downtime.
Each time a wire bobbin is changed, the welding torch should be removed from the power
source and blown clean with compressed air.
The wire end must not have sharp edges when inserted into the wire liner.
For detailed information see instruction manuals for welding torches.
0221323
- 67 -
© ESAB AB 2014

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Warrior 400i cvWarrior 500i ccWarrior 500i cv

Tabla de contenido