Descargar Imprimir esta página

EMAK BT 3000 Instrucciones De Uso página 42

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

1 motor off, spark plug cable disconnected, fuel supply shut
2
The shredder must only be transported in a trailer.
Use appropriate loading ramps.
Tie the shredder down correctly using straps.
To unload, follow these instructions in reverse.
(to be carried out by your approved service agent) (Wear gloves)
- Disconnect the spark plug cable
- Open the obstruction clearance hatch (see VI –e)
- Remove the feeding chute (see V 2g)
- Using a 4 mm Allen key and a 10 mm open ended spanner, unscrew the 3 screws (1) and nuts (2) holding the 2 blades
in place (3).
- Always replace the 2 blades at the same time. Always replace the screws and nuts when replacing the blades.
(Warning: only blades and retaining screws specifically designed for your shredder must be used.)
- mount the new blades (tightening torque 9,8 N.m).
VII / TRANSPORT
Do not lift the shredder
VIII / CHANGING THE BLADES
2
13 - EN
Tie-down points
for trailer transport
3
1

Publicidad

loading

Este manual también es adecuado para:

Sh 300