Descargar Imprimir esta página

Werner NSRS-72 Instrucciones De Ensamblaje página 11

Andamio rodante de acero capacidad de carga distribuida: 567 kg

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS FOR INTERLOCKING SYSTEM
Fig A is a visual representation of linking feature using two Werner
Multi-Purpose (NSRS-72MP) scaffolds
STEP 1. Please follow the required criteria below for safe setup
and use:
Only link with Werner Multi-Purpose Scaffold
(NSRS-72MP)
Before linking, ensure both platforms are set at
same standing height.
STEP 2. Reference Fig B for operation of the linking bracket
Ensure insertion bracket piece emphasized to in
Fig C is not visible when linked.
Be sure to inspect linking bracket before each use.
Check bracket hinges are in good condition.
Fig. B: Operating Linking Bracket
WARNING:
Insertion
Piece
Fig. C: Interlocking Open
• Side braces must be level and locked before using.
• All 4 casters must be locked before use.
• Follow all applicable ANSI & OSHA guidelines along with state and local codes
or the use of this product when used individually or linked.
Fig. A

Publicidad

loading

Este manual también es adecuado para:

Srs-72caSrs-72Nsrs-72mp114563-01114563-02