INSTALLATION
Before beginning installation, to better handle the hood, we advise removing the filter.
Before fixing, the outlet exhaust duct for air evacuation to the outside must be installed.
Use an outlet exhaust duct with: - minimum indispensable length; -Minimum possible
bends (maximum angle of bend: 90°); -certified material (according to local, building &
fire regulations); and as smooth as possible inside. It is also advisable to avoid any
drastic changes in duct cross-section (recommended diameter: 125mm).
Decide on the position of the hole for the air outlet: The hole may be in the wall or the
ceiling, according to your requirements, but must be in vertical line with your hood.
Select the type most suited to your needs and
proceed by mounting the air outlet adapter (C)
Drill the hole in the wall for the air outlet (133 mm
diameter) referring to drawings here on the right
where the measurements for the various possibilities are
indicated.
IMPORTANT: Respect the distance between the hob and
lower part of the hood which must be at least 650mm.
Fitting under wall unit
1.
Before fixing the hood to the wall unit, drill a hole of 133mm diameter in the wall
unit.
2.
In any case, check the position of the power outlet considers where the power
cable will run, since a hole might have to be made in the wall unit to
accommodate it.
3.
Draw a line on the wall in vertical line with your hob. Mark the 2 holes to be drilled
in the wall, respecting the distances indicated; Make the 2 holes and fit the 2
screw anchors provided. Take screws (2) ST5*50mm and screw them down
completely. Hang the hood on the 2 screws.
20
6