Adjusting Pad Pressure; Adjusting Squeegee Lift Cable; Draining Tanks; Draining Recovery Tank - Castex BA-1700 Manual De Operación Y De Piezas

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATION

ADJUSTING PAD PRESSURE

NOTE: On rough surfaces it may be necessary to
reduce brush pressure.
To adjust pad pressure, turn adjustment knob
clockwise to decrease or counterclockwise to increase
pad pressure. Adjustment knob is located below brush
lift pedal (Figure 29).
FIG. 29

ADJUSTING SQUEEGEE LIFT CABLE

To adjust squeegee lift cable, loosen lock nuts and
turn adjustment stem on squeegee cable. Retighten
lock nuts after adjusting (Figure 30).
FIG. 30
14
Home
Find... Go To..

DRAINING TANKS

When to drain recovery tank:
– After each use.
– Between solution tank fill ups.
– When solution flow stops during operation.
– When ball float screen is activated.
– When squeegee starts trailing water.
NOTE: If using the ESt recycling system, be certain
to drain and rinse both tanks after each use.
FOR SAFETY: Before leaving or servicing
machine, stop on level surface and turn off
machine.

DRAINING RECOVERY TANK

ATTENTION: Do not allow foam or water to enter
float shut–off screen, vacuum motor damage will
result; not covered by warranty. Foam will not
activate float shut–off screen.
1. Push machine to floor drain and turn off all
switches. Remove left side drain hose from holder,
position hose over drain, twist loose, and remove
drain hose cap (Figure 31).
FIG. 31
NOTE: If using a bucket to drain machine, do not use
same bucket for filling solution tank. This will prevent
possible solution line clogs.
2. Open clear recovery tank lid and rinse tank, ball
float screen and ESt filter if equipped. Remove
and rinse ball float screen and ESt filter if they
are excessively dirty. Replace screen and filter
securely.
3. Replace drain hose plug securely when empty.
BA-1700 (02–04)

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

607395

Tabla de contenido