5.2 Protective equipment required
Read the safety instructions under „1. For your sa-
fety" on page 10.
Symbol
Designation
Safety helmet
Protective gloves
Work clothing
First aid equipment
5.3 Required tools
Symbol
Designation
Measuring tape
Angle
Spirit level
Stepladder
Open-end spanner SW10
Rubber or wooden hammer
Pin
Silicone
Drill & masonry bit 10 mm
Cable tester
Knife or scissors
Phillips screwdriver
6. Transport
CAUTION
Risk of injury and material damage due to in-
correct transport.
►Only transport the product disassembled
and with several people.
►Read chapter„8. Disassembly" on page 13.
7. Use
CAUTION
Risk of injury due to improper use.
►Use the product in accordance with its in-
tended use, see chapter „1.2 Use as inten-
ded" on page 10.
NOTICE
Damage to the product due to strong we-
ather.
►Always keep openings such as doors or
windows closed in windy conditions.
8. Disassembly
►Disassemble the product in reverse order of assem-
bly, see chapter „15. Assembly" on page 35.
9. Store
NOTICE
Damage to the product due to incorrect
storage.
►When storing the dismantled product
outdoors, make sure that you store the
assembly material protected from the
weather.
►Store the scaffold parts and multi-skin
sheets protected from light as far as pos-
sible.
We recommend that they are generally sto-
red indoors in a dry, warm place protected
from light.
10. Maintenance and schedule
10.1 Cleaning
CAUTION
Risk of injury.
►Do not enter the roof during mainte-
nance and cleaning work.
►Remove snow from the roof with a
broom as long as it is fresh and soft.
Wet snow and inadequate cleaning
can lead to roof ice, associated inju-
ries and overloading of the structure.
EN
13