IMPORTANT
Please
read these
instructions carefully before you start to assemble this greenhouse.
Keep these
instructions
in
a
safe
place
for future
reference.
This
icon indicates
that the installer should
be
inside the
product
»
Customer
Service
For
assistance
with
assembly or for replacement parts
-
please log
onto our website
or
call
our
service line
(number
is
on
the title
page).
Additional information
can be
found
at
our website: www.palramapplications.com
Safety Advice
It
is
of utmost importance to
assemble
all
of
the parts according to the directions.
Do
not
skip any step.
We
strongly recommend
using
work
gloves during assembly.
Always
wear
shoes and safety
goggles when working with extruded aluminium.
If using
a
step ladder or power tools make sure
that you follow the manufacturer's
safety
advice.
Do
not touch overhead power cables
with
the aluminium profiles.
Do
not
attempt
to assemble the greenhouse
in
windy or wet conditions.
Dispose
of
all
plastic
bags. Keep
them out of
reach
of
small
children.
Keep
children away from the assembly
area.
Do
not
lean
against or push the greenhouse during construction.
Do
not position your greenhouse
in an area
exposed to excessive wind.
Do
not
attempt
to assemble this greenhouse if you
are
tired,
have
taken drugs or
alcohol or if you
are
prone to dizzy
spells.
Hot items such
as
recently
used
grills,
blowtorches
etc.
must not
be
stored
in
the
greenhouse. make
sure
there
are no
hidden pipes or cables
in
the ground before
inserting the
pegs.
This
product
is
designed to
be used
as
a
greenhouse only.
Care &
Maintenance
When
your greenhouse
needs
to
be
cleaned,
use
a
mild detergent solution and
rinse
with
cold clean water.
DO NOT use
acetone, abrasive cleaners or
other
special
detergents to
clean
the clear
panels.
It
is
recommended to check periodically that
roof
panels caps (plastic part 329
&
profile
981) are set in place.
»Tools
&
Equipment
Work gloves
Rubber mallet
Phillips head screwdriver
Adjustable Spanner
/Wrench
Leveler
Tape
measure
Scissors
Silicone spray
/
Lubricant
Ladder
T001
-
Special
tool for
Screws
411
and nuts
412
0
Before
Assembly
IR
Selecting
a
site:
-
The
greenhouse must
be
positioned
and fixed on
a
flat
level surface.
-
Choose
a
sunny position away from
overhanging
trees.
IR
We
strongly recommend to
secure
this
greenhouse directly to
a
solid concrete
foundation,
use
the
pre
drilled
holes
in
the metal
base.
IR
This
is a
multi-part
assembly best
achieved by
two
people. Allow at least
half
a
day
for the assembly
process.
IR
Take all
components
&
parts
out of the
packages. Sort
the parts and check
against the contents parts
list.
Parts
should
be
laid
out
close at hand.
Keep
all
small parts (screws etc.) in
a
bowl
so
they do not get
lost.
IR
Please
note multi-sided profiles
are used
in
this greenhouse.
As
a
result some
holes
in
the profiles
are
not
used
during
assembly.
IR
Please
review entire instructions before
starting. Carry out the assembly
steps in
exact order.
»
Notes
During Assembly
You
may
use
Silicon
lubricant
spray
in
order to help you slide the panels into the
profiles.
Do
not spray the Polycarbonate
panels.
Use
a
rubber mallet if
necessary.
mDuring
assembly you
will encounter the information
icon, please refer to the relevant assembly step
for
additional comments and
assistance.
Step 11: Make
sure
the
base
is
square by measuring the
diagonals and
level by using
a
spirit
level.
Steps 15:
Part
7180
is
used
for assembly
assistance.
Steps 30: After installing the gutter,
it
is
mandatory to
remove and discard
(Part
7180).
Steps 51+52:
Please
repeat
steps
48-50 and work
according to the parts id mentioned
in
this manual.
Step
61
:
Please
add silicone on the outer
area
of
parts
7581
& 7582
as
illustrated.
Step 72:
In
case
the window
is
not properly aligned,
please
loosen
the
screws,
adjust the profile and re-tighten the
screws.
Step 89:
Make
sure
the
cable
is
threaded
in
the hole
(#7327) and does not interfere
with
the
window' opening.
Step 90: Anchor the greenhouse to the ground
by using
part
7331
for
hard surface
or part 7336 for soft
surface.
Step 92: Stretch the cable
by using
part 7332.
A\
Important
Recommendations
Firmly connect the greenhouse to
a
level
position
immediately after completion of the
assembly.
Anchoring the greenhouse
can also be
done by
drilling
the
base
profiles
and
fastening it to the ground using
ground
screws
or spikes (screws and spikes are not
supplied).
Tighten
all screws once assembly
is
completed.
Please
note: Anchoring this product to the ground
is
essential
to
its
stability
and
rigidity.
It
is
required to complete this stage
in
order for your
warranty to
be
valid.
Screws
411
and nuts 412
are used
throughout
the assembly
process.
Screws
411
are
to
be
assembled from the outside and nuts
412
from the inside of the
greenhouse.
If
not specified otherwise, do not fasten
screws
and nuts
(411 &
412)
for more than
2-3
turns.
Do
not tighten them until completion of the panels'assembly.
These
2
icons
indicate if
screw's
tightening
is
required or not.
However,
in
some steps,
temporary tightening of
a
few
screws may
be
needed
to prevent
a
profile from sliding out.