© SurgeX | Technical Support: 800-645-9721 | surgex.com
I
Expanded System Using
[3 1
,"·-·
II
1234567
A-ON C
B A
SEQ
Program:
Down
=
Up&
Inputs
Momentary
12VDC Output
•
A,
BotC
•!Set
12V Delay On
as Needed)
•I
S et
12V Delay
Off
as Needed)
Aux
OUtput
•Confrnl
Five
Bank
SIGNAL
PROCESSING
REMOTE
EQUIPMENT
EQUIPMENT
RACK
(POWERED
BY
SX1120RT)
5&
4
Connect pins
oflhe
3
2
SEQ
to
pins
&
of
the
SX1120RTinside
the
equp
i
ment
rack
as per
4
Figure
Program
lhe
SEO
12V
fnl
DC
output
to be the
bank
Inthe sequence.
The
will
equp
i
ment rack
then
turnon
first and olflast.
SEQ/SEQ-1U
I
12V
DC
Output
1
1234567
A.Qn
Switched
SX1 120-RT
Figure
4
Expanded
System
Example
AMPLIFIER
AMPLIFIER
6
7
Connect pins
&
of
the
SEQ to
as
3.
SXt
120RT
per Figure
Then
first SXI120RT
to
pins
t
&
2 of
the
Continuecomecting
as
many
SX1120RTs as
There
isnolimn
to
the
number of additionalunns
way.
I
be connected
In
his
Program lhe SEQ
be
the
last
bank
inthe
sequence.
tum
onlast
and
off
first.
FigureS
User Manual
Software Version 2.0
II
AMPLIFIER
1
2
first
pins
&
of
the
pins
6
7
connect
&
olthe
second
SX1120RT.
needed.
thaican
A""
Output
lo
All
the amplif ens
Wllllhen
Page 19