Installation (continued)
7
Installing the plaster guard
and cartridge
□
Install the o-rings (1) and cartridge (2) onto the
valve body (D). Make sure the cartridge (2) is
installed correctly. Slide the bonnet (3) over the
cartridge (2) and thread them onto the valve
body (D). Tighten bonnet (3) securely with
adjustable wrench until the o-ring (1) on the
valve body (D) is covered completely.
Install the sleeve (4), and hand-tighten it only.
□
Place the plaster guard (L) onto the valve
body (D) and secure with the screws (K).
NOTE: Be sure to position the plaster guard (L) correctly
onto the valve body (D), with the side marked "SHOWER"
facing upward.
3
4
L
K
1
2
8
Installing the tub spout
□
Wrap thread sealant tape around the pipe
threads of the tub spout (J) outlet in a clockwise
direction, as shown.
□
Thread the tub spout (J) onto the threaded
connection in a clockwise direction until the tub
spout (J) becomes ush with the nished wall.
□
Use the strap wrench to tighten the tub spout (J).
NOTE: Do not wrap the sealant tape over the threaded
part (1) of the tub spout outlet pipe. Apply silicone to the
side of the spout ange (2). Clean away any excess putty.
D
2
J
11
Please contact 1-855-HD-GLACIER for further assistance.
1
HOMEDEPOT.COM/GLACIERBAY