Descargar Imprimir esta página

Green GT30 Manual De Uso Y De Instalación página 12

Publicidad

Idiomas disponibles

Idiomas disponibles

6.
STEP 1 - Removing the skylight.
STEP 3 - Positioning the housing.
STEP 5 - Mounting the mounting brackets.
Electrical box Green GT30s 24V - DS600031
22
Electrical box Green GT30 12V - DS600030
STEP 2 - Applying rubber sealant.
STEP 4 - Connecting the power cable to
the box.
STEP 6 - Positioning the finish of the housing.
STEP 8 - Connecting the power cable to the
battery.
STEP 10 - Final application.
ATTENTION: The system is completed with refrigerant and oil
before shipment. After the first installation, do not fill the system
with more refrigerant and oil. If the refrigerant gas and/or oil
leakage during the installation of the air conditioner, add 80ml
of electric compressor-specific oil. The oil used in this system
must be of high quality (ISO VG68).
Electrical box Green GT30s 24V - DS600031
Electrical box Green GT30 12V - DS600030
ENGLISH
STEP 7 - Applying plugs.
STEP 9 - With housing on, check pressures.
23
23

Publicidad

loading

Productos relacionados para Green GT30

Este manual también es adecuado para:

Gt30sDs600030Ds600031