J
x2
P
x2
Put parts ''J'' and ''P'' into left groove of the front tube, then tighten the
screws on the "P".
Insert the plug "K-1" into the front tube, a wooden hammer tool can be
used to help with installation.
Put parts ''J'' and ''P'' into right groove of the front tube, then tighten the
screws on the "P".
Insert the plug "K-2" into the front tube, a wooden hammer tool can be
used to help with installation.
16
K-1 x1
K-2 x1
D-1 x1
D-2 x1
14mm 17mm
Put the square tube "B-1" through the part "D-1".
The square tube should be a little longer than the part "D-1".
Insert the roller tube "A" into the part "D-1" gear box hole, then put "D-2"
part into the "B-2" square tube, and make sure the roller tube "A" is also
inserted into the fixing hole meanwhile.
17