8. OPERATION
Initial Set-up
ATTENTION:
ries to makeadjustments, or the device is not in use..
1. Installation of the blower and vacuum tube
• This accessory is divided into two movable parts, which are fixed and secured through slots and screws.
•
First step: Align the parts to be engaged and slide them to allow access to the screw. Then tighten screw.
This instruction serves for all movable parts. Figure 8.2
2. Installation of the bag
• Connect clip into slot which is located on the larger movable tube. Figure 8.3
• Align the collector bag entrance to the debris output of the product. Figure 8.4
• Slide it into place. Figure 8.5
FIGURE 8.3
3. Harness Installation
Attach the carrying strap clip to the eyelet on the handle 10.
4. Powering the Equipment
ATTENTION:
good order and is securely tightened in place.
Stop the machine and make clean the on / off switch to OFF before you add accesso-
FIGURE 8.1
Each time before starting the engine, inspect the entire unit to see if every part is in
FIGURE 8.4
30
FIGURE 8.2
FIGURE 8.5