M-24-01
LIFT CORPORATION Sht. 9 of 76 DSG#
Rev. - Date: 05/07/24
PREPARE LIFTGATE - Continued
REMOVE KNOCKOUTS
4. Verify which knockouts to remove from the
bottom of main frame housing (FIG. 9-1).
Then, remove the knockouts as needed.
KNOCKOUTS
MAIN FRAME
REMOVING KNOCKOUTS FROM
MAIN FRAME HOUSING
FIG. 9-1