6. System preparation
6.1. Start up of new system
To ensure smooth start-up of the new system, follow
these guidelines.
6.2. Bleeding guidelines
6.2.1. Bleeding the pipe system
•
Close water supply after use.
•
Regular bleeding may be necessary after pro
longed shutdowns.
6.2.2. Bleeding the pump
•
Start the pump to force any remaining air pockets
to the top of the pump.
•
Stop the pump.
•
Loosen the relief plug 1-2 turns again and bleed
until only water flows.
•
Tighten the relief plug.
•
Never loosen the relief plug while the pump is in
operation as this may damage the gasket.
A
DETAIL A
•
The unit is now ready for use.
6.3. Adjustments
6.3.1. Instruction and setup
Refer to the user guide and software manual for gen-
eral machine operation instructions.
0627131
110009489
37