Descargar Imprimir esta página

Robern SCULPT YM2033ANPFNZH86 Manual Del Usuario página 13

Espejo colgante

Publicidad

MIRROR ASSEMBLY
3. Insert the provided M5 Screw [203-1695] through the desired pin location as determined by the ceiling height (see page 4) and
temporarily secure with the provided M5 Hex Nut [203-1697]. Do NOT tighten.
NOTE: Do NOT insert the screw through the bracket hole yet. This will lock Down Rod in position and prevent further assembly.
4. As needed, attach the Down Rod Extension(s) using the provided Down Rod Connectors [219-1747].
3
4
© 2024 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376
www.robern.com
13
Part no. CB-209-1455 01/25/2024
Sculpt Hanging Mirror Installation

Publicidad

loading

Productos relacionados para Robern SCULPT YM2033ANPFNZH86

Este manual también es adecuado para:

Sculpt ym2040snpfnzh86