SHOWER SYSTEM
Step 1: Clean the water pipe and install the curved connector
cold
hot
a) Run the water around 1-2 minutes
to clean the water pipe.
Step 2: Install the thermostatic shower bar
a) Take the base off the thermostatic
shower bar.
d) Secure the base by screws
Step 3: Assemble the pipe for the shower head
a) Install the rubber seal into the
bottom of the raiser rail.
13
Teflon tape
b) Wrap the teflon tape anticlockwise on the
thread of the G1/2 end of the curved connector,
connect them to the hot and cold water outlets
by a wrench. Leave suitable depth out of the
wall and adjust the distance between 2
connectors according to the width of the inlet
on the thermostatic shower bar.
3M sticker
b) Use the spirit level to make sure the base
remains horizontal. Press the spirit level into
the base and peel off the cover of the sticker
on the back of the base.
e) Remove the spirit level
b) Connect the raiser rail to the thermostatic
panel and mark the installation position.
4
12
c) Make sure the 2 curved connectors are
installed deadly straight into the wall. The
centre distance between 2 curved connectors
is 150±8mm.
c) Install the thermostatic shower bar base over
the curved connectors. Adjust the base till it's
level and mark the position on the wall.
f ) Install the thermostatic shower bar over the
base and use the Allen key to secure . Left
side is hot water and right side is cold water.
Φ6mm
c) Remove the raiser rail and drill holes on
the marked position.
EN