Descargar Imprimir esta página

MrHeater MH25NG Instrucciones De Uso Y Manual Del Usuario página 9

Calentador infrarrojo a gas para taller

Publicidad

Idiomas disponibles

Idiomas disponibles

3.3 Piping INSTALLATION
While ensuring that all of the above gas supply
requirements and piping requirements are fulfilled,
install piping as follows:
A. In accordance with the above piping requirements,
assemble piping, sediment trap, shutoff valve, and
necessary fittings. Tighten all components securely.
WARNING: Failure to ensure that male threads
on pipe to be installed into gas valve meet the
requirements of Figure 6 may cause gas valve
damage, distortion and malfunction.
B. Install a threaded nipple, prepared in accordance
with paragraph 3.2 into gas valve.
Gas Fired Infrared Workshop Heater
C. Connect gas piping to nipple installed in the gas
valve.
WARNING: When testing gas piping use only
a soap and water solution. Do not use a match
or other flame for leak testing. If during leakage
check gas is smelled, turn off the gas supply and
ventilate building.
D. Ensure the building is properly ventilated. Without
lighting the pilot light of the heater, open the gas
supply valve and pressurize the piping up to the
heater's gas valve.
E. Using a brush, apply a soap and water solution to all
connections and look for bubbles indicating a leak.
If a leak is detected, turn off gas supply and tighten
connections. Retest and tighten connections.
Figure 7. Typical Piping Installation
E9
Operating Instructions and Owner's Manual

Publicidad

loading

Este manual también es adecuado para:

Mh22lpMh25lpF272200F272100