Descargar Imprimir esta página

Atlantic 507515 Manual Del Usuario página 26

Publicidad

Idiomas disponibles

Idiomas disponibles

Vertical Model
Drilling
points
1
Fix the wall bracket to the floor
and against the wall. Identify
the drilling points A. These give
the position of the lower fixings.
Drill the 4 holes and put appropriate raw plugs in your wall (e.g.
3
plaster board, concrete). Position the bracket and screw it in.
- The radiator must be supplied with 230 V Single-phase 50Hz.
- The supply to the device must be directly connected to the network
after the omni-pole cut-off device with a contact opening distance of at
least 3mm without any intermediate switch (clock, mechanical relay and
static relay, ambient thermostat, etc...).
- Connecting to the network will be done using a 3 wire cable (Brown
= Phase, Blue = Neutral, Black = Pilot wire) via the intermediary of a
connection box. In humid locations such as kitchens and bathrooms, the
connection box must be installed at least 25 cm from the ground.
- The installation must be equipped with a protection device of circuit-
breaker type.
Connection to earth is forbidden.
Do not connect the pilot wire (black wire) of the device to earth.
- If the supply cable is damaged, it must be replaced by the manufacturer,
by its after-sales service or by a person of similar qualifications in order to
avoid danger.
A
CONNECT THE RADIATOR
B
Drilling
points
2
Screw
Move the wall support up,
causing the points previously
identified with the drilling holes
A to coincide.
Mark the 2 drilling points B
using a ball point pen.
B
A
25

Publicidad

loading

Este manual también es adecuado para:

Rmgd-mk21Rmgvd-mk21Nirvana507520