Installation And Connection; Tools Required; Installing And Connecting The Control Box - Waeco AMP100 Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 34
AMP100
6

Installation and connection

6.1

Tools required

For installation and assembly you require the following tools:
Measuring ruler (fig. 3 4, page 4)
Centre punch (fig. 3 5, page 4)
Hammer (fig. 3 6, page 4)
Drill bit set (fig. 3 7, page 4)
Drill (fig. 3 8, page 4)
Screwdriver (fig. 3 9, page 4)
For making and testing the electrical connection the following tools are required:
Diode test lamp (fig. 3 1, page 4) or voltmeter (fig. 3 2, page 4)
Insulating tape
Heat shrinking sleeve
Hot air blower (fig. 3 10, page 4)
Crimping tool (fig. 3 11, page 4)
Soldering iron, if required (fig. 3 12, page 4)
Solder, if required (fig. 3 13, page 4)
Cable bushing sleeves, if required
6.2

Installing and connecting the control box

The control box is supplied ready for installation.
Install the control box in a location protected from water near the monitor, prefera-
bly under the dashboard.
Make sure to consider the length of the cable.
Attach the control box using the supplied screws.
Insert the plug and the cable set in the connection provided (12 - 24 V) on the switch
box.
Connect the brown cable (fig. 5 9, page 6) to earth.
Connect the red cable (fig. 5 8, page 6) to an active positive line (such as
terminal 15).
Warning!
Ensure that you connect the control cables correctly to + PLUS an not to
earth. Connecting the control cables to earth can damage the device.
Connect the green cable (fig. 5 5, page 6) to the positive cable of the reversing
light.
Installation and connection
21

Publicidad

Tabla de contenido
loading

Tabla de contenido