Descargar Imprimir esta página

mundoclima BBC 200 Manual De Instalación, Uso Y Mantenimiento página 89

Publicidad

Idiomas disponibles

Idiomas disponibles

9 - START-UP
12
All piping properly installed and free of leaks.
13
Hydraulic system filled, pressurised and drained
14
Expansion tank checked / filled with nitrogen
15
Condensate and safety valve drains
Condensate drain line installation
16
Must be located with access to an adequate drain
17
Condensate drain lines installed and piped to an adequate drain
18
The unit requires 220-240 VAC for proper operation.
19
Wiring size and connections comply with all local applicable codes and the requirements of this manual.
20
The unit and electrical supply are properly grounded.
21
Proper overload fuse or circuit breaker protection installed.
How to check the power supply socket and plug are qualified?
22
Turn on power supply and keep the unit running for a half hour, then turn off power supply and plug out, check whether
the socket and plug is hot or not.
Post Installation Review
1
Understand how to use the User Interface Module to set the various modes and functions.
Understand the importance of routine inspection/maintenance of the condensate drain pan and lines. This is to help
2
prevent any possible drain line blockage resulting in the condensate drain pan overflowing.
IMPORTANT: Water coming from the plastic shroud is an indicator that both condensation drain lines may be blocked.
3
Immediate action is required.
4
To maintain optimal operation check, remove and clean the air filter.
33

Publicidad

loading

Este manual también es adecuado para:

Bbc 200sBbc 300Bbc 300s