Descargar Imprimir esta página

RIB AA52012 Instrucciones De Instalación página 31

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

EMERGENCY RELEASE
The mod. INDUSTRIAL barrier can be manually operated in a blackout by inserting the crank
into the hole on one side (Pic. 7).
When the crank has been inserted, a switch will depress and disconnect the line. This
prevents the operator from being injured by sudden unexpected manoeuvres if the
electricity supply returns.
MAINTENANCE
To be undertaken by specialized staff after disconnecting power supply.
After every 50.000 cycles check the tightness of the boom holding attachment, and the
wear on the mechanical stops.
Grease the bearings of the boom carrier shaft.
L (from 6,5 m to 9,5 m)
A
L
A (mm)
10 m
1205
10,5 m
750
11 m
950
11,5 m
1150
12 m
720
200 mm
B
A
BA10003
SHOCK-ABSORBER
L (from 10 m to 12 m)
E
A
B
B (mm)
C (mm)
3490
610
4390
220
4390
420
4390
420
5290
260
L
A (mm)
6,5 m
1055
7 m
855
7,5 m
1105
8 m
875
8,5 m
1125
9 m
925
9,5 m
725
BA10003
SHOCK-ABSORBER
C
B
D (mm)
E (mm)
1205
5000
750
5250
900
5500
1150
5750
440
6140
31
B (mm)
N° HANGING RACKS
4390
1 ACG8290 + 1 ACG8291
5290
2 ACG8291
5290
2 ACG8291
6250
2 ACG8290 + 1 ACG8291
6250
2 ACG8290 + 1 ACG8291
7150
1 ACG8290 + 2 ACG8291
8050
3 ACG8291
200 mm
ACG8285
HANGING SUPPORT
D
N° HANGING RACKS
4 ACG8290
2 ACG8290 + 2 ACG8291
2 ACG8290 + 2 ACG8291
2 ACG8290 + 2 ACG8291
4 ACG8291
G
B
6
7
8

Publicidad

loading

Este manual también es adecuado para:

P1-crxIndustrial p1