Pump Tube Upper Packing; Weep Hole Lubricant Travel; Attach Pump Tube To Air Motor - Alemite 7795-A5 Manual De Servicio E Instalación

Bomba de engrase alta presión
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pump tube upper packing

1)
1)
Air motor piston rod

Weep hole lubricant travel

1)
To atmosphere
23
25
26
13
16
7
1)
Fig. 3
14
49 Screw pump tube (26) onto adapter (41)
6
13
15
16
50 Screw primer body (50) (with low
17
18
7
51 Screw jam nut (22) onto pump tube.
19
52 Push on plate (48) to expose
8
9
20
Attach pump tube to
21
22
air motor
24
53 Screw coupling onto air motor piston rod
22
54 Install spring clip (24).
55 Screw pump tube into body (7).
56 Place a large wrench or other suitable
Fig. 4
57 Tighten jam nut (22).
11
NOTE
If a primer is used with low strength
threadlocker, curing time is greatly
reduced.
(with low strength threadlocker)
(→ Fig. IPB 2, page 18). Do not tighten.
strength threadlocker) into opposite end
of adapter. Do not tighten.
coupling (23) from pump tube as
necessary.
until spring clip holes align. Rotate entire
pump tube.
tool into the slot of primer body (50).
Tighten all components securely. Crush
all gaskets.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

7795-b5

Tabla de contenido