instatlation
instructions
[]
REPLACE THE BASE GRILLE
Replace the grille bg installing the two Phillips
head screws.
[] START THE ICEMAKER
Set the icemaker power switch to the I (on)
position. The icemaker will not begin to operate
until it reaches its operating
temperature
of 15°F (-9%) or below, It will then begin
operation
automaticallg.
It will take 2-3
dags to fill the ice bin.
NOTE:
In lower water pressure conditions,
the water
valve mag turn on up to 3 times to deliver
enough water to the icemake[
[]
SET THE CONTROLS
Set the controls to the recommended
setting,
[R OOMMENO O
CONT OLSE ,NOS
I
0 "F IS RECOMMENDED
37 '1_ IS RECOMMENDED
31