Descargar Imprimir esta página

GE Profile PIT23SGRCSV Manual Del Propietario E Instalación página 31

Lado a lado

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Instructions
[] REPLACE THE BASE GRILLE
Replace
the grille
by installing
the two
Phillips
head screws.
[] START THE ICEMAKER
Set the icemaker
power
switch
to the
I (on) position.
The icemaker
will
not
begin
to operate
until
it reaches
its
operating
temperature
of 15°F (-9°C)
or below.
It will
then
begin
operation
automatically.
It will take 2-3 days to
fill the ice bin.
Pow
switch
-
I
NOTE:
In lower
water
pressure
conditions,
the
water
valve
may turn
on up to 3 times
to deliver
enough
water
to the icemaker.
[] SET THE CONTROLS
Set the controls
to the recommended
setting.
5
5
[.EOOMME.OEO
CO.T.OLSE .°OS]
0 _: IS RECOMMENDED
37• IS RECOMMENDED
31

Publicidad

loading